Showing posts with label Insulation. Show all posts
Showing posts with label Insulation. Show all posts

Thursday, 17 May 2012

Odds and Sods

The plasterer has been delayed until Monday now, which is probably just as well as Stu still hasn't quite finished the wall insulation (between some of the rooms as a soundproofing measure), despite the fact he has been there every evening this week.
We had some doors put on yesterday which was pretty exciting until I realised that the wrong front door had been put on. It's the right style, but has been primed for painting rather then being a wood ready for varnishing. KB have told me they will change it later on, which Freya is upset about as she likes the door being aqua. The laundry door is also on, and the internal door into the garage as well.
We were contacted by Beaumonts yesterday, giving us the news that the carpet we wanted is no longer available. I asked if we could find something similar, and today Karen got back to me telling me they had managed to find a roll in Sydney that will do our house. It then got a bit strange as she told me despite the price not changing since we did the selections, it was now going to cost me more. I queried this, and spoke to Ian at KB who contacted Karen then got back to me within 10 minutes assuring me that we were not being charged more and were still within our budget.
The other thing that came up is that Stu discovered one of the windows had these strange little beads between the two glass panes. So I took some pics and forwarded to the window company, who agreed immediately that it was faulty and have ordered a replacement.
The plumbers have also been back, doing some more fitting off, and the carpenters have done some bracing to my book shelf/wall, and have now attached it to the floor.
So although not much has changed at the house, there has still been quite a bit happening.

The faulty window

Sunday, 13 May 2012

Roof insulation completed

After several days hard work Stu and I have managed to finish installing the roof insulation. We took on this job to save some money, but with the time it took, plus our ebay bargain turning out to be not quite so much of a bargain we are only just ahead from what it would have cost us to have the builders complete it. Oh well, you live and learn.
We have also finally decided what hot water service to go with. After much research we have decided to use an Apricus Evacuated tube Solar, with electric boosting. We have gone electric as we are not on town gas and as we are expecting to install solar power hopefully not too far in the future this will be hopefully a better way for us to boost. To help minimise the boosting, we have gone the evacuated tubes which heat up the water more efficiently, and are also having a stand on the roof to maximise heat absorption. The stand has already been installed and it's going to take a bit of getting used to, but it's there for a purpose after all, not to look pretty.

The new stand minus the evacuated tubing

We had another site meeting late last week, just confirming a few things. Plasterer is now set to be started this Thursday, and brickwork to start the following Monday.

Tuesday, 8 May 2012

Bricks on site

The first load of bricks were delivered yesterday and the rest are due to come after the brickwork starts.
Electricians ended up working all day yesterday and half of today as well, took a bit longer then we expected.
Stu has almost finished installing the wall insulation but due to the nice weather forecast for tomorrow he will probably get back on the kanga and dig the pit for the electrical cable to run from the garage to the shed, if it gets left much longer I doubt it could get done until next Summer with how boggy it is out there.
So Thursday together we will be doing the roof insulation. I had hoped that all the insulation would be done by then so we could take advantage of our child free day and go to Melbourne and check out some lighting shops, but not to be.
KB cleaned up the mess today (so my floor looks nice and clean again after all the mess from the various tradies, was strange seeing it dirty after always seeing it clean) and they finished installing the roof battens. They have also changed the book shelf/wall and it looks great now, much better being wider and higher.

Exciting to see some bricks arrive (18 pallets)