Showing posts with label Lighting. Show all posts
Showing posts with label Lighting. Show all posts

Friday, 24 August 2012

One week to go

The house is progressing so well. Every time I turn up now there is something new to see, it's so exciting.
The external painting is really coming along fast, all plumbing fit off has been completed, lots more electrical done, cooktop and rangehood installed and today the window washers were doing their thing as well.
Hard to believe that this time next week we will have the keys to the house - and hopefully have already completed some unpacking.

Stainless yet to be added between the cooktop and the window
as a safety measure

kitchen tap...now with running water!!!

breakfast bar pendants

Tuesday, 21 August 2012

Busy busy busy

So much is happening it's all so very exciting.
The panel lift door did get installed on Saturday. At first the colour choice seemed wrong, but after getting used to it,  I think we have done the right thing.
Yesterday the tiler finished- at last- and the plumbers began their fit out. They got lots in, although there was a slight mishap with the kitchen tap - which is now sorted, and the ensuite toilet of course couldn't go in due to the tiles just being laid. They will be back on Thursday to finish up. I so want to run a tap, but don't want to waste any of our precious water.
The electricians were back again today, and have been fitting off the pre mounted lights and also lots of the power points. Also today the door handles have been put on, the shower screens installed and the remaining shelving for the WIP is also up.
I forgot to check the external painting, it's so easy to get distracted looking at what has been done!
Still no sign of the AC people hopefully they turn up soon. Electrical will be continuing on tomorrow, windows to be washed Friday, and carpet due to be laid on Monday. So so close now...

Bathroom shower

Bathroom 

WIP

ensuite
Garage door


Thursday, 19 July 2012

Half a kitchen!

Spoke to our builder yesterday and as a second thought, after telling me nothing had really happened at the house this week, he remembered the joiners had been in and started installing the kitchen. Despite having a meeting there tomorrow morning, I couldn't wait all that time, so dashed out during lunchtime today to have a squiz.
The breakfast bar is not installed yet - it's piled up in the Walk in pantry. Benchtops are also not on yet, at the moment it's just chipboard.

I'm guessing that's the upstand part of the breakfast bar sitting on the bench

the blue sticker on the drawer is because the rails are missing

The study desk is also in place now, as are the shelving. I think this colour has come up great, I'm really pleased he edged the shelves to match, I hadn't expected that, but it finishes it off nicely.



They have also prepared the boxing for the concreting for the alfresco, front porch and back porch.

Look at all that beautiful winter sun, perfectly sheltered from the wind. Can't wait to use this area!
More winter sun flooding the house and warming up
the concrete brilliantly. Love it.
Now to update on a few things that have been brought up in the past.
The sliding window that had those little beads in it has now been replaced; the cupboard in the powder room has been removed as it was made larger then it should have been which is why there was no space for the toilet; and the big 'X' in the living room will be staying. They think it was caused by the trowelling machine back when the concrete was poured. To get rid of it would mean grinding down the floor so much that it would have a dip in it. Looks like we now have a very special character mark and talking point!
We also managed to finish choosing our lights last weekend, and are currently working out what to do curtain wise. Looks like some compromises will have to be made due to budgetary restrictions. I'm disappointed but not devastated.  The hose is still connected to the septic. I'm hoping that can come off soon and then the rain can start properly and get our tanks filling.

Sunday, 17 June 2012

It's all happening now

Not a lot happened at the house after lock up due to everyone experiencing difficulties in getting equipment to the house. The polisher finally came towards the end of the week, but managed to get bogged and not get his heavy equipment unloaded. The HWS people also turned back. We have ordered another 6 trucks worth of recycled concrete to reinforce the driveway and hopefully this should make things easier. This should be happening at the start of the week, hope it doesn't get put off like it did last time.
We had a meeting with our builder on Saturday, and there is a lot about to happen.
Early this week the plumber is finally going to do some drainage work around the house which should also help a bit, and Glen thinks that the excavator may be used to lift the polishers heavy equipment into the house too. The water tanks should hopefully get connected by the end of this week as well, will be great seeing some of this water collected.
The tiler is ready to start doing some screeding and the painter is ready for everyone else to be done!
Meanwhile Dan the fit out man has been working there all weekend, and has managed to put architrave, skirting and cupboard doors up in the girls bedrooms and laundry, and also do the doors in our section, and the skirting and architrave in our room and the WIR. I am really surprised at how different this makes the rooms look. He won't be able to finish the fit out until the concrete has been finished.
So providing the access issue can get sorted, the next few weeks are set to be pretty busy.
We now have to pick our garage door type, and do up some drawings on how we want our cupboards to be set out.
Managed to get a couple of lights yesterday, and are getting closer to a decision on the remaining lights. This lighting decision is really doing my head in, and so far has been the only thing I haven't enjoyed choosing.
Rather then tracking mud through the house today I walked around with only my socks on. It's a pretty cold day and my feet didn't even feel chilled! Looks like our thermal mass is doing its job :D