Friday, 13 July 2012

A nice surprise

Septic got installed yesterday, and there have been a few issues regarding getting enough water into the tank in order to stop it from 'floating up'. Stu put 400 litres in last night, and today the plumbers have attached a hose from our water tanks to feed direct to the septic. Nice that the septic is sorted, but not really happy that our tanks won't be gaining from any rainfall we get. I'm probably the only person around here that is hoping for a lot of rain in the next few weeks.
I did get a nice surprise going in the house. I had expected lots more fit out to be completed. That hasn't progressed (although when I went back this afternoon to get some photos, the fit out man had started working and was still there when I left). However, some of the cabinets have been installed already!
We now have the bathroom cabinets, the laundry cabinets - except for some doors, and we also have the bookcase installed. Pretty exciting stuff.

The bookcase

Ensuite

Powder room. VERY concerned with the proximity of the toilet plumbing

laundry

Girls bathroom

Tuesday, 10 July 2012

Concrete floor polished at long last!

Yesterday the polishing of the floor was finished. I had assumed that was it for the floor so was all excited to go and see a shiny beautiful floor done. I was so disappointed to turn up and see that it was filthy, and worst of all the cracks are still visible. They aren't 'cracks' any longer as they have been filled, but you can still see where the cracks were. It's probably something that will only stand out to me, well hopefully anyway! Even worse - a new crack has appeared that runs from the outer dining wall all the way across the room to the corner of the living room. Bummer.
I went back this morning to take some photos as yesterday afternoon the polisher was still finishing up, and am much happier with it today. Amazing what a nights sleep can do!

Rumpus room with cupboard on left looking towards passage
Kitchen/Dining standing at hallway door
Kitchen, dining and living standing at WIP door
Kitchen/dining from master bedroom door

Living room to kitchen, air lock door to right
Close up of kitchen floor
crack in hallway
crack near master bedroom
Strange 'X' shape in living room 

The final coating of the sealer will happen when the floor gets buffed, which won't happen until after the professional cleaners go through, so not until just before handover! Such a long time to wait. I was very pleased to hear from the polisher that he has used an eco product to seal the floor though. We had mentioned this to him back when he did the original grinding before frameworks started, and he gave me the impression then that it wasn't really doable, so a very nice surprise to hear that he managed it after all.
Stu met with the septic man to discuss placement and so on today. Works are supposed to start this Thursday. I dread to think of the mess they are going to make to the remainder of the block.